BRD's Eco-Friendly Building Materials for Data Center Construction

Publish Time: 2025-05-09     Origin: Site

What Is a Data Center?

A data center is a dedicated facility used to house computer systems and related components such as servers, networking equipment, power supplies, and cooling systems. These facilities must operate 24/7 with maximum uptime, high security, and precise environmental control.


This article explores the key materials used in data center construction, and how BRD, a trusted manufacturer, installer, and supplier, empowers businesses to build world-class data centers with next-generation materials and expert support.


Core Building Materials for Data Center Construction

Sandwich Wall and Roof Panel

BRD’s sandwich panels—made with high-quality EPS, PU or Rockwoolcores—offer:

  • Excellent thermal insulation to reduce energy consumption for cooling

  • Superior fire resistance (Bomba Certification BS8414, BS476 Part 22) to protect sensitive IT equipment

  • Fast, clean installation through prefabrication and modular assembly

These panels are ideal for both exterior and interior partitions, ensuring a controlled environment within the server rooms.



Steel Structure

Data centers must support heavy equipment and allow for future scalability. BRD’s precision-engineered steel structures are:

  • Durable and lightweight

  • Resistant to corrosion

  • Customizable for multistory or large-span designs

They allow fast construction while maintaining exceptional load-bearing capacity and seismic safety.



Metal Deck

BRD’s metal deck products are used in raised flooring systems and roofing, providing:

  • Efficient airflow management for underfloor cooling

  • Structural support for cable trays and ducts

  • Flexible access for future maintenance or upgrades

Combined, these materials create an infrastructure optimized for high performance and reliability.



Why Choose BRD for Your Data Center Construction?

At BRD, we don’t just supply materials—we provide end-to-end solutions for data center installation and development. Here’s what makes us stand out:

  • One-Stop Service

From consultation and structural design to material supply and on-site installation, BRD delivers full-service support for seamless data center infrastructure setup.

  • Eco-Friendly & Low Carbon Materials

Our products are designed with sustainability in mind. This reduces the energy needed for HVAC systems in data centers, lowering operational carbon emissions over time. BRD's sandwich panels are prefabricated and cut to size, which minimizes on-site waste and reduces construction time. Prefabrication also results in less dust, noise, and disruption to the environment.

  • High Customization

We understand that every data center is unique. BRD offers flexible dimensions, fire ratings, insulation values, and colors to match your technical and architectural needs.

  • Global Experience

With production and service centers in Malaysia, China, Japan, and Indonesia, and successful projects across Southeast Asia, the Middle East, and Europe, BRD has deep international experience in data center design and build projects.


Let’s have a quick view of our data center project in Malaysia and see how BRD Malaysia can help build your next facility with sustainable and high-performance materials.


For more information:
WA
+6011-2281 7777

WA +6011-2297 7777

EMAIL: sales@brdmy.com

Sandwich Panel Thickness Guide for Cold Room Applications

Selamat Hari Raya Aidilfitri – Holiday Closure Announcement

BRD Polyurethane Edge-Sealed Rockwool Panels for Nanjing Gaochun Biomedical Industrial Park

Transforming Industrial Spaces: How BRD Sandwich Panels Boost Efficiency and Safety

Factory Layout Optimization Using BRD Sandwich Panel Systems