BRD Supplies Rockwool Panels for Khartoum Government Power Plant Project in Sudan

Views: 565     Author: Site Editor     Publish Time: 2019-12-06      Origin: Site

Project: Khartoum Government Power Plant Project

Product: Rock Wool Sandwich Wall Panel

Location: Khartoum, Sudan


BRD Group is proud to have supplied Rockwool panels for the Khartoum Government Power Plant Project in Sudan. This critical infrastructure project underscores BRD's commitment to delivering high-quality building solutions for essential facilities around the world.

rockwool-sandwich-panel (1)

Rockwool panels were selected for their outstanding thermal insulation and fire resistance properties, making them an ideal choice for power plant applications. These panels help maintain optimal temperatures within the plant, ensuring efficient operation of equipment and reducing energy costs. Their fire-resistant nature adds an essential layer of safety, protecting the facility from potential fire hazards.


rock-wool-sandwich-wall-panels1


The use of Rockwool panels also aligns with sustainable building practices, as they are durable and require minimal maintenance, ensuring long-term performance. Their lightweight design allows for quick installation, minimizing construction time and reducing labor costs.


rock-wool-sandwich-wall-panels2


Since the project is a power generation project, our sales manager recommended rockwool insulation panel to the customer. The biggest advantage of our rockwool sandwich panels is fire resistance. More importantly, the environmentally friendly rockwool board has strong deformation resistance and is not easy to crack, and can achieve the same service life as the building.


rock-wool-sandwich-wall-panels3


Due to this building is of great importance, our senior engineer Mr. Jiao went to site for tracking schedule and provided construction guide. He even stayed with workers for a month in order to guarantee the successfully completion of the project. Mr. Jiao said:” I’m so happy to be here and provide solution to problems for customers. It’s my mission and also BRD’s mission.”


For more information:
WA
+6011-2281 7777

WA +6011-2297 7777

brdmaterial@gmail.com

PRODUCTS

CONTACT US

 : +60 11 2281 7777
 : sales@brdmy.com
 : +60 11 2281 7777
: Lot 577, Jalan Merbau, Kampung Perepat, Batu 7 1/2 Jalan Kapar, 42200 Kapar, Selangor, Malaysia.
Copyright ©  1995-2024 BRDECO Group. All Rights Reserved.